We have no experience, but we want to buy equipment but can't operate it. What should we do?
Don't worry, our engineers will guide your team to use the equipment.
|
|
-
What if there is a problem with the equipment we purchased?
If there is a problem with your equipment, you can take videos and pictures,our engineers will provide guidance to you.
|
|
-
Do you accept customized?
Yes, our equipment can be customized and designed according to your requirements.
|
|
-
Can we make an appointment to see the factory?
Of course.You are welcome to visit the factory at any time. We can also take you on a tour of the customer's facility to see what equipment is in operation.
|
|
|
|
-
How long is the construction period of clean room project?
The construction period of the clean room project is affected by the area, class, construction difficulty, transportation time of materials and equipment, and the cooperation mode between Party A and Party B. Relevant information is required to make an estimate.
1. Area, class. If the area is large, class requirement is strict, and there are temperature and humidity requirements, it is necessary to use constant temperature and humidity air conditioning units. The supply cycle of constant temperature and humidity air conditioning units is generally longer than that of ordinary equipment, and the construction period needs to be extended accordingly. Customized air conditioning units are generally delivered in 25-30 days.
2. Difficulty of construction. For example, it is inconvenient to handle materials on high floors, especially large plates and air-conditioning equipment.
3. Time for transportation of materials and equipment.
4. Cooperation mode between Party A and Party B. This includes a lot, such as: the time of signing the contract, whether to pay in time according to the agreement, the time of materials entering the site, and so on. If the cooperation is pleasant, it usually can be completed according to the prescribed time.
For example, it normally takes 40 to 50 days to build a 300㎡ 100,000-class dust-free workshop without temperature and humidity requirements, including the floor, ceiling, partition, air conditioning and ventilation duct, and the completion of acceptance.
|
|